91大黄鸭

Skip to content

Okanagan candidates question Conservatives promise of 2nd lake crossing

'Promising a new crossing by 2032 is nearly impossible'

B.C. Conservative Leader John Rustad says it鈥檚 time for a serious plan to build a second crossing over Okanagan Lake.

During an announcement Friday (Oct. 4) about his party鈥檚 childcare plan he was asked how a Conservative government could plan, build and pay for a second bridge connecting 91大黄鸭 and West 91大黄鸭 by 2032 as promised. 

鈥淭he existing crossing is expected to max out capacity by 2040,鈥 he said. 鈥淚 suspect with the growth that we鈥檙e seeing here it could actually reach that even earlier.鈥

A June 23, 2023, (MOTI) Rob Flemming stated that the Central Okanagan is expected to grow by 60,000 residents by 2040. A 2019 staff report to 91大黄鸭 council on a second bridge and a freeway bypass indicated the project would cost well in excess of $1 billion at the time.

In March 2023, MOTI unveiled its Central Okanagan Integrated Transportation Study, a 20-year vision for transportation needs in the Okanagan Valley. It did not include a second crossing but did recommend a sixth lane on the existing bridge dedicated to transit. 

The City of 91大黄鸭 plans to address traffic congestion including redundancy to Highway 97 with the Clement Avenue extension and a new transit yard to expand the regional transit fleet.

Rustad added a plan to build a second crossing needs to engage with First Nations, communities and residents.

鈥淭hat needs to be developed, and as soon as we get that developed then we will allocate funding to get it built.鈥 

91大黄鸭-Centre NDP candidate Loyal Wooldridge said while improvements are needed along the Highway 97 corridor, the Conservatives are promising something without thorough analysis.

鈥淭heir promise is fiscally irresponsible, untrustworthy, electioneering,鈥 Wooldridge said in an emailed statement. 鈥淭hey have no intention to collaborate with First Nations or municipalities鈥

He said promising a new crossing by 2032 is nearly impossible.

鈥淏y impacting WFN lands, reallocation of land would be required with federal government approvals which can take 5-10 years. A rough estimate of a new bridge would cost roughly $3 billion-plus, not including additional land costs and new road connections.鈥 

In an Instagram post, West 91大黄鸭-Peachland Independent candidate Stephen Johnston said the Conservatives鈥 promise is questionable and overlooks long-standing challenges his riding has faced for decades.

鈥淯nless they intend to address these significant infrastructure deficits, this is nothing more than cheap talk.鈥

As an example, Johnston posted that Westside Road, where a second crossing would be established, is 鈥渙ne of the most dangerous roads in Canada, and certainly in B.C.鈥

鈥淚mmediate upgrades are essential to improve safety and prevent accidents on this critical route.鈥

Unless the Conservatives are promising to build everything at once Johnston added, pushing ahead with a second crossing while neglecting these urgent needs would be reckless.

Breaking News You Need To Know

Sign up for free account today and start receiving our exclusive newsletters.

Sign Up with google Sign Up with facebook

This site is protected by reCAPTCHA and the Google and apply.

Reset your password

This site is protected by reCAPTCHA and the Google and apply.

A link has been emailed to you - check your inbox.



Don't have an account? Click here to sign up


About the Author: Gary Barnes

Journalist and broadcaster for three decades.
Read more



(or

91大黄鸭

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }