91大黄鸭

Skip to content

Boardwalk upgrade at 91大黄鸭鈥檚 Cook Road boat launch begins

Until the end of August, the City of 91大黄鸭 will be upgrading the existing gravel path to a wooden pedestrian boardwalk
25736354_web1_210708-KCN-Cook-Road_1

A boardwalk makeover at the Cook Road boat launch in 91大黄鸭 is scheduled to begin on Wednesday (July 7).

Until the end of August, the City of 91大黄鸭 will be upgrading the existing gravel path to a wooden pedestrian boardwalk that will connect the boat launch with the boardwalk located along the waterfront at Hotel Eldorado.

The new boardwalk will be more accessible and wider than its gravel counterpart and is designed to improve public entry to the waterfront.

鈥淲e鈥檙e pleased to be able to improve continuous public waterfront in this popular area,鈥 says Andrew Gibbs, the City of 91大黄鸭鈥檚 project manager.

鈥淓xpanding the public鈥檚 access to our lakefront for all residents to enjoy is a community priority.鈥

READ MORE: Opera 91大黄鸭 returns to the stage

READ MORE: Woman attempts swim across Okanagan Lake for fundraiser



aaron.hemens@kelownacapnews.com

Like us on and follow us on .





(or

91大黄鸭

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }