91大黄鸭

Skip to content

Parking lot closed for construction at 91大黄鸭's Mission Creek Greenway

Construction work is expected for a week
13380455_web1_180905-mission-creek-greenway
Mission Creek Greenway Regional Park. 鈥擨mage: Central Okanagan Land Trust

The Mission Creek Greenway Regional Park parking lot at Truswell Road and Lakeshore Road will be closed for a week due to construction.

Work crews will be installing a new, year-round and accessible washroom facility, starting on Monday, Nov. 25.

According to the Regional District of Central Okanagan (RDCO), access to the park will not be affected but visitors are asked to obey construction signage.

The next closest entrance points to the regional park are located at:

  • Gordon Drive and Lexington Drive (parking lot) near Mission Dog Park;
  • Casorso Road and Swamp Road (parking area).

 



Jordy Cunningham

About the Author: Jordy Cunningham

Hailing from Ladner, B.C., I have been passionate about sports, especially baseball, since I was young. In 2018, I graduated from Thompson Rivers University in Kamloops with a Bachelor of Journalism degree
Read more



(or

91大黄鸭

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }